Q25.

Ventilation of sewer lines is necessary to :

  • A. avoid building up to sewer gases
  • B. ensure atmospheric pressure in the waste water surface
  • C. ensure the safety of sewer maintenance people
  • D. all of these

    ✍ Discuss    
Q26.

Critical factors for the activated sludge treatment process are :

  • A. maximum hourly flow rate
  • B. maximum and minimum flow rate
  • C. maximum hourly flow rate and maximum daily organic load
  • D. minimum hourly flow rate and minimum daily organic load

    ✍ Discuss    
Q27.

The unit in which both sedimentation and degestion processes of sludge take place simultaneously is :

  • A. Skimming Tank
  • B. Imhoff Tank
  • C. Detritus Tank
  • D. Digestion Tank

    ✍ Discuss    
Q28.

From amongest the following sewage treatment options, largest and requirement for given discharge will be needed for :

  • A. trickling filter
  • B. anaerobic pond
  • C. oxidation ditch
  • D. oxidation pond

    ✍ Discuss    
Q29.

The BOD removal efficiency, in precentage, during primary treatment, under normal conditions is about :

  • A. 65%
  • B. 85%
  • C. 30%
  • D. ZERO

    ✍ Discuss    
Q30.

The trickling filter is designed to remove:

  • A. Settleable Solids
  • B. Colloidal solids
  • C. Dissolved Organic Matter
  • D. None of these