♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
Delta for a crop when its duty ...
Que.
Delta for a crop when its duty is 864 hect/cumec on the field , will be (if base period of this crop is 120 days ) :
A.
110 cm
B.
120 cm
C.
130 cm
D.
140 cm
Right Answer is :
✓ B. 120 cm
⚑ Report
Views 👍 :2.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The based period of a 6 h ...
➣ "Specific yield" for an unconfined aquifer is ...
➣ If a tengent drawn parallel to the ...
➣ If a river in an alluvial plain ...
➣ An undisturbed rock sample has on oven ...
➣ The amount of irrigation water required to ...
➣ The meander belt for an alluvial stream ...
➣ Out of 150 cm of water pumped ...
➣ In India, which of the following is ...
➣ If the area of catchment is 567 ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Water Supply
➤ Soil Mechanics and Foundation
➤ Concrete Structure
➤ Fluid Mechanics and Hydraulics
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Transportation Engineering