Hydrology
The meander belt for an alluvial stream ...
Que.
The meander belt for an alluvial stream is estimate to be 9 km. The peak discharge in this river will roughly be the order of :
A.
40.60 cumecs
B.
16.00 cumecs
C.
13.77 cumecs
D.
18.89 cumecs
Right Answer is :
✓ C. 13.77 cumecs
⚑ Report
Views 👍 :1.1K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If a tengent drawn parallel to the ...
➣ If wheat requires about 7.5 cm of ...
➣ An undisturbed rock sample has on oven ...
➣ On suitable foundation, the earthen dam can ...
➣ A well with a radius of 0.5 ...
➣ If intensity of rainfall is more than ...
➣ The statement "ordinate of the direct runoff ...
➣ If wind velocity at a height of ...
➣ In gravity dam, the main overturning force ...
➣ What is the evaporation, if 4.75 litre ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Fluid Mechanics and Hydraulics
➤ Transportation Engineering
➤ Hydrology
➤ Surveying
➤ Strength of Material
➤ Irrigation
➤ Soil Mechanics and Foundation