Hydrology
The meander belt for an alluvial stream ...
Que.
The meander belt for an alluvial stream is estimate to be 9 km. The peak discharge in this river will roughly be the order of :
A.
40.60 cumecs
B.
16.00 cumecs
C.
13.77 cumecs
D.
18.89 cumecs
Right Answer is :
✓ C. 13.77 cumecs
⚑ Report
Views 👍 :1.2K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The meander belt for an alluvial stream ...
➣ An undisturbed rock sample has on oven ...
➣ If electrical conductivity of water is in ...
➣ Out of 150 cm of water pumped ...
➣ What volume is represented by 57mm of ...
➣ In India, which of the following is ...
➣ If in mass curve, a demand line ...
➣ The amount of irrigation water required to ...
➣ An irrigation canal is to be designed ...
➣ If a river in an alluvial plain ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Transportation Engineering
➤ Concrete Structure
➤ Building Material
➤ Surveying
➤ Irrigation
➤ Pollution (Air and Noise)
➤ Steel Structure