♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
The meander belt for an alluvial stream ...
Que.
The meander belt for an alluvial stream is estimate to be 9 km. The peak discharge in this river will roughly be the order of :
A.
40.60 cumecs
B.
16.00 cumecs
C.
13.77 cumecs
D.
18.89 cumecs
Right Answer is :
✓ C. 13.77 cumecs
⚑ Report
Views 👍 :1.2K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If a tengent drawn parallel to the ...
➣ If in mass curve, a demand line ...
➣ The statement "ordinate of the direct runoff ...
➣ Delta for a crop when its duty ...
➣ What is the evaporation, if 4.75 litre ...
➣ In India, which of the following is ...
➣ The meander belt for an alluvial stream ...
➣ If wind velocity at a height of ...
➣ What is the evaporation, if 4.75 litre ...
➣ On suitable foundation, the earthen dam can ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Soil Mechanics and Foundation
➤ Building Material
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Concrete Structure
➤ Solid Waste and Waste Water Treatment
➤ Hydrology