The meander belt for an alluvial stream ...
Que.
The meander belt for an alluvial stream is estimate to be 9 km. The peak discharge in this river will roughly be the order of :
A.
40.60 cumecs
B.
16.00 cumecs
C.
13.77 cumecs
D.
18.89 cumecs
Right Answer is :
✓ C. 13.77 cumecs
⚑ Report
Views 👍 :1.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The 6000 hectares of gross commanded area ...
➣ If intensity of rainfall is more than ...
➣ If the area of catchment is 567 ...
➣ What volume is represented by 57mm of ...
➣ "Specific yield" for an unconfined aquifer is ...
➣ The area, on which crops are growing ...
➣ What is the evaporation, if 4.75 litre ...
➣ What is the evaporation, if 4.75 litre ...
➣ An undisturbed rock sample has on oven ...
➣ If wind velocity at a height of ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Steel Structure
➤ Hydrology
➤ Solid Waste and Waste Water Treatment
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Irrigation
➤ Building Material