♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
The meander belt for an alluvial stream ...
Que.
The meander belt for an alluvial stream is estimate to be 9 km. The peak discharge in this river will roughly be the order of :
A.
40.60 cumecs
B.
16.00 cumecs
C.
13.77 cumecs
D.
18.89 cumecs
Right Answer is :
✓ C. 13.77 cumecs
⚑ Report
Views 👍 :1.2K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ On suitable foundation, the earthen dam can ...
➣ In India meterological sub-division is considered to ...
➣ In gravity dam, the main overturning force ...
➣ If a tengent drawn parallel to the ...
➣ The amount of irrigation water required to ...
➣ If a river in an alluvial plain ...
➣ An irrigation canal is to be designed ...
➣ The value of Sodium Absorption Ratio for ...
➣ A well with a radius of 0.5 ...
➣ What is the evaporation, if 4.75 litre ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Surveying
➤ Concrete Structure
➤ Steel Structure
➤ Concrete Technology
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Transportation Engineering