♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
The meander belt for an alluvial stream ...
Que.
The meander belt for an alluvial stream is estimate to be 9 km. The peak discharge in this river will roughly be the order of :
A.
40.60 cumecs
B.
16.00 cumecs
C.
13.77 cumecs
D.
18.89 cumecs
Right Answer is :
✓ C. 13.77 cumecs
⚑ Report
Views 👍 :1.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If wind velocity at a height of ...
➣ If the area of catchment is 567 ...
➣ What is the evaporation, if 4.75 litre ...
➣ In India, which of the following is ...
➣ What is the evaporation, if 4.75 litre ...
➣ An undisturbed rock sample has on oven ...
➣ If intensity of rainfall is more than ...
➣ On suitable foundation, the earthen dam can ...
➣ An irrigation canal is to be designed ...
➣ Out of 150 cm of water pumped ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Water Supply
➤ Building Material
➤ Steel Structure
➤ Concrete Structure
➤ Hydrology
➤ Irrigation
➤ Pollution (Air and Noise)