♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :4.1K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Out of 150 cm of water pumped ...
➣ "Specific yield" for an unconfined aquifer is ...
➣ What is the evaporation, if 4.75 litre ...
➣ If a river in an alluvial plain ...
➣ If base period for a particular crop ...
➣ An undisturbed rock sample has on oven ...
➣ If a tengent drawn parallel to the ...
➣ If wind velocity at a height of ...
➣ On suitable foundation, the earthen dam can ...
➣ If one cumec of water is pumped ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Steel Structure
➤ Fluid Mechanics and Hydraulics
➤ Miscellaneous
➤ Hydrology
➤ Concrete Technology
➤ Pollution (Air and Noise)