♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :4.1K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ What is the evaporation, if 4.75 litre ...
➣ An irrigation canal is to be designed ...
➣ On suitable foundation, the earthen dam can ...
➣ In gravity dam, the main overturning force ...
➣ If electrical conductivity of water is in ...
➣ If one cumec of water is pumped ...
➣ An undisturbed rock sample has on oven ...
➣ If wind velocity at a height of ...
➣ If wheat requires about 7.5 cm of ...
➣ On suitable foundation, the earthen dam can ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Miscellaneous
➤ Strength of Material
➤ Pollution (Air and Noise)
➤ Concrete Technology
➤ Surveying
➤ Steel Structure