♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :3.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ On suitable foundation, the earthen dam can ...
➣ On suitable foundation, the earthen dam can ...
➣ "Specific yield" for an unconfined aquifer is ...
➣ What is the evaporation, if 4.75 litre ...
➣ Delta for a crop when its duty ...
➣ If wheat requires about 7.5 cm of ...
➣ What is the evaporation, if 4.75 litre ...
➣ If one cumec of water is pumped ...
➣ If a river in an alluvial plain ...
➣ If co-efficient of veriation of rainfall values ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Steel Structure
➤ Strength of Material
➤ Water Supply
➤ Concrete Structure
➤ Building Material
➤ Fluid Mechanics and Hydraulics
➤ Pollution (Air and Noise)