An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :3.0K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ According to Lacey, the depth of scour ...
➣ If the area of catchment is 567 ...
➣ In gravity dam, the main overturning force ...
➣ If a river in an alluvial plain ...
➣ If in mass curve, a demand line ...
➣ Out of 150 cm of water pumped ...
➣ The meander belt for an alluvial stream ...
➣ The 6000 hectares of gross commanded area ...
➣ The area, on which crops are growing ...
➣ Delta for a crop when its duty ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Building Material
➤ Concrete Structure
➤ Irrigation
➤ Strength of Material
➤ Solid Waste and Waste Water Treatment
➤ Pollution (Air and Noise)
➤ Fluid Mechanics and Hydraulics