♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :2.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If a tengent drawn parallel to the ...
➣ An undisturbed rock sample has on oven ...
➣ What is the evaporation, if 4.75 litre ...
➣ The based period of a 6 h ...
➣ Delta for a crop when its duty ...
➣ If electrical conductivity of water is in ...
➣ What volume is represented by 57mm of ...
➣ If the area of catchment is 567 ...
➣ What is the evaporation, if 4.75 litre ...
➣ The area, on which crops are growing ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Fluid Mechanics and Hydraulics
➤ Water Supply
➤ Pollution (Air and Noise)
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Strength of Material
➤ Transportation Engineering