♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :2.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ What is the evaporation, if 4.75 litre ...
➣ What is the evaporation, if 4.75 litre ...
➣ In gravity dam, the main overturning force ...
➣ If a tengent drawn parallel to the ...
➣ What volume is represented by 57mm of ...
➣ The area, on which crops are growing ...
➣ Delta for a crop when its duty ...
➣ The based period of a 6 h ...
➣ If wheat requires about 7.5 cm of ...
➣ An undisturbed rock sample has on oven ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Concrete Structure
➤ Irrigation
➤ Miscellaneous
➤ Water Supply
➤ Pollution (Air and Noise)
➤ Building Material
➤ Concrete Technology