♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :3.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The meander belt for an alluvial stream ...
➣ The based period of a 6 h ...
➣ An undisturbed rock sample has on oven ...
➣ The statement "ordinate of the direct runoff ...
➣ The area, on which crops are growing ...
➣ If the area of catchment is 567 ...
➣ On suitable foundation, the earthen dam can ...
➣ What is the evaporation, if 4.75 litre ...
➣ What is the evaporation, if 4.75 litre ...
➣ "Specific yield" for an unconfined aquifer is ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Strength of Material
➤ Irrigation
➤ Water Supply
➤ Building Material
➤ Fluid Mechanics and Hydraulics
➤ Solid Waste and Waste Water Treatment
➤ Miscellaneous