♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :3.0K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ An undisturbed rock sample has on oven ...
➣ "Specific yield" for an unconfined aquifer is ...
➣ On suitable foundation, the earthen dam can ...
➣ What is the evaporation, if 4.75 litre ...
➣ If co-efficient of veriation of rainfall values ...
➣ The value of Sodium Absorption Ratio for ...
➣ Delta for a crop when its duty ...
➣ The area, on which crops are growing ...
➣ What is the evaporation, if 4.75 litre ...
➣ What is the evaporation, if 4.75 litre ...
❖ Take a qick MCQ Test on
➤ Building Material
➤ Surveying
➤ Miscellaneous
➤ Water Supply
➤ Concrete Structure
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Solid Waste and Waste Water Treatment