♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :2.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If the area of catchment is 567 ...
➣ The based period of a 6 h ...
➣ The statement "ordinate of the direct runoff ...
➣ On suitable foundation, the earthen dam can ...
➣ What volume is represented by 57mm of ...
➣ What is the evaporation, if 4.75 litre ...
➣ Delta for a crop when its duty ...
➣ If one cumec of water is pumped ...
➣ The area, on which crops are growing ...
➣ The 6000 hectares of gross commanded area ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Water Supply
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Miscellaneous
➤ Transportation Engineering
➤ Concrete Structure
➤ Surveying