♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :2.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The value of Sodium Absorption Ratio for ...
➣ The amount of irrigation water required to ...
➣ What is the evaporation, if 4.75 litre ...
➣ An undisturbed rock sample has on oven ...
➣ If wheat requires about 7.5 cm of ...
➣ The meander belt for an alluvial stream ...
➣ Out of 150 cm of water pumped ...
➣ What is the evaporation, if 4.75 litre ...
➣ If a tengent drawn parallel to the ...
➣ The based period of a 6 h ...
❖ Take a qick MCQ Test on
➤ Building Material
➤ Fluid Mechanics and Hydraulics
➤ Strength of Material
➤ Transportation Engineering
➤ Surveying
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment
➤ Hydrology