♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Hydrology
An irrigation canal is to be designed ...
Que.
An irrigation canal is to be designed to deliver 8.3 cumecs to meet the peak Rabi demand of a total of 8000 hectares of cropped area. The estimated canal losses are 25 % of the head discharge . The duty an capacity of this will be :
A.
723.32 ha/cumecs
B.
800 ha/cumecs
C.
594.64 ha/cumecs
D.
694.34 ha/cumecs
Right Answer is :
✓ A. 723.32 ha/cumecs
⚑ Report
Views 👍 :4.1K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ An irrigation canal is to be designed ...
➣ The statement "ordinate of the direct runoff ...
➣ The 6000 hectares of gross commanded area ...
➣ What is the evaporation, if 4.75 litre ...
➣ If in mass curve, a demand line ...
➣ An undisturbed rock sample has on oven ...
➣ If base period for a particular crop ...
➣ According to Lacey, the depth of scour ...
➣ "Specific yield" for an unconfined aquifer is ...
➣ The meander belt for an alluvial stream ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Fluid Mechanics and Hydraulics
➤ Solid Waste and Waste Water Treatment
➤ Transportation Engineering
➤ Building Material
➤ Irrigation
➤ Steel Structure
➤ Water Supply