♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Irrigation
A balancing reservoir : ...
Que.
A balancing reservoir :
A.
balances peak and minimum flows
B.
balances the distribution
C.
balances flow rates of supply and demand
D.
stores water for emergencies
Right Answer is :
✓ C. balances flow rates of supply and demand
⚑ Report
Views 👍 :2.2K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A snow density of 0.1 may be ...
➣ Double mass curve technique is followed to ...
➣ Garrets diagrams are based on : ...
➣ The unit of area of a hydorgraph ...
➣ If absolutely no error is allowed in ...
➣ A standard project flood is : ...
➣ How many additional gauges are required in ...
➣ A channel designed by Lacey's theory has ...
➣ The mean annual runoff rate from a ...
➣ A balancing reservoir : ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Surveying
➤ Pollution (Air and Noise)
➤ Hydrology
➤ Concrete Structure
➤ Solid Waste and Waste Water Treatment
➤ Fluid Mechanics and Hydraulics
➤ Building Material