The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The type of sewer which is suitable ...
➣ Which of the following statements explains the ...
➣ The maximum efficiency of BOD removal is ...
➣ In which treatment unit is "Schmutz decke" ...
➣ The minimum dissolved oxygen which should always ...
➣ Critical factors for the activated sludge treatment ...
➣ Are requirements (ha) for disposal of the ...
➣ After which of the following water treatment ...
➣ The biochemical treatment of sewage effluents is ...
➣ Which of the following pairs is not ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Pollution (Air and Noise)
➤ Concrete Structure
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Solid Waste and Waste Water Treatment