♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Solid Waste and Waste Water Treatment
The maximum efficiency of BOD removal is ...
Que.
The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The process in which chlorination is done ...
➣ The process of lagooing is primarily a ...
➣ The unit in which both sedimentation and ...
➣ Following reactions take place during anareobic digestion ...
➣ From amongest the following sewage treatment options, ...
➣ In facultative stabilization pond, the sewage is ...
➣ Which of the following terms, correctly describes ...
➣ The time of concentration is defined as ...
➣ In which treatment unit is "Schmutz decke" ...
➣ Which of the following pairs is not ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Pollution (Air and Noise)
➤ Concrete Structure
➤ Miscellaneous