The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The type of sewer which is suitable ...
➣ In which treatment unit is "Schmutz decke" ...
➣ The two main gases liberated from an ...
➣ Following reactions take place during anareobic digestion ...
➣ The unit in which both sedimentation and ...
➣ which of the following sewage treatment methods ...
➣ The working conditions in imhoff tanks off ...
➣ The correct relation between theoretical oxygen demand ...
➣ The process of lagooing is primarily a ...
➣ The biochemical treatment of sewage effluents is ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Hydrology
➤ Transportation Engineering
➤ Surveying
➤ Miscellaneous
➤ Fluid Mechanics and Hydraulics
➤ Concrete Technology
➤ Water Supply