♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Solid Waste and Waste Water Treatment
The maximum efficiency of BOD removal is ...
Que.
The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The maximum efficiency of BOD removal is ...
➣ After which of the following water treatment ...
➣ Which one the following types of settling ...
➣ The ratio of 5 days BOD to ...
➣ Total volatile suspended solids to be anaerobically ...
➣ Are requirements (ha) for disposal of the ...
➣ Which of the following units works in ...
➣ The correct relation between theoretical oxygen demand ...
➣ which of the following sewage treatment methods ...
➣ In the design of grit chambers : ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Concrete Structure
➤ Fluid Mechanics and Hydraulics
➤ Pollution (Air and Noise)
➤ Surveying
➤ Miscellaneous
➤ Soil Mechanics and Foundation
➤ Concrete Technology