The maximum efficiency of BOD removal is ...
Que.
The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The unit in which both sedimentation and ...
➣ The type of sewer which is suitable ...
➣ The time of concentration is defined as ...
➣ The ratio of 5 days BOD to ...
➣ The biochemical treatment of sewage effluents is ...
➣ The maximum efficiency of BOD removal is ...
➣ Which of the following are claimed as ...
➣ The process in which chlorination is done ...
➣ Critical factors for the activated sludge treatment ...
➣ Which of the following units works in ...
❖ Take a qick MCQ Test on
➤ Miscellaneous
➤ Water Supply
➤ Transportation Engineering
➤ Strength of Material
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Concrete Structure
➤ Pollution (Air and Noise)