The maximum efficiency of BOD removal is ...
Que.
The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ What is the most common causes of ...
➣ When there is no recirculation of sewage, ...
➣ After which of the following water treatment ...
➣ Which one the following units is employed ...
➣ Which of the following treatment processes are ...
➣ The minimum dissolved oxygen which should always ...
➣ In facultative stabilization pond, the sewage is ...
➣ In which treatment unit is "Schmutz decke" ...
➣ The process in which chlorination is done ...
➣ The effect of increasing diameters of sewer ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Concrete Structure
➤ Strength of Material
➤ Miscellaneous
➤ Steel Structure
➤ Water Supply
➤ Soil Mechanics and Foundation
➤ Transportation Engineering