Que.
The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ After which of the following water treatment ...
➣ In the design of grit chambers : ...
➣ Which of the following terms, correctly describes ...
➣ Which of the following treatment processes are ...
➣ Sludge volume index is defined as the ...
➣ The process in which chlorination is done ...
➣ Total volatile suspended solids to be anaerobically ...
➣ Ventilation of sewer lines is necessary to ...
➣ which of the following sewage treatment methods ...
➣ Are requirements (ha) for disposal of the ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Concrete Structure
➤ Steel Structure
➤ Solid Waste and Waste Water Treatment
➤ Miscellaneous
➤ Transportation Engineering
➤ Strength of Material
➤ Hydrology