The maximum efficiency of BOD removal is ...
Que.
The maximum efficiency of BOD removal is achieved in :
A.
oxidation pond
B.
oxidation ditch
C.
aerated lagoons
D.
trickling filters
Right Answer is :
✓ B. oxidation ditch
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ 'Air binding' may occur in : ...
➣ In the design of grit chambers : ...
➣ Velocity of flow does not depend on ...
➣ The characteristics of fresh and septic sewage ...
➣ Following reactions take place during anareobic digestion ...
➣ Which of the following terms, correctly describes ...
➣ Ventilation of sewer lines is necessary to ...
➣ Are requirements (ha) for disposal of the ...
➣ Composting and lagooning are the methods of ...
➣ Which of the following treatment processes are ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Solid Waste and Waste Water Treatment
➤ Miscellaneous
➤ Fluid Mechanics and Hydraulics
➤ Concrete Structure
➤ Water Supply
➤ Concrete Technology
➤ Strength of Material