Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Invar tapes are made of an alloy ...
➣ A field is measured with a 1.0 ...
➣ In soil stabilisation : ...
➣ The closing error in a traverse is ...
➣ An offset more than 15 m length ...
➣ On a right angled road inter-section with ...
➣ Negative errors are caused in chain, when ...
➣ Which of the following statements is/are correct ...
➣ The main difference between optical square and ...
➣ True meridians : ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Concrete Structure
➤ Pollution (Air and Noise)
➤ Steel Structure
➤ Strength of Material
➤ Hydrology
➤ Water Supply
➤ Building Material