Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In soil stabilisation : ...
➣ In whole circle system, the bearing are ...
➣ When speed of traffic flow becomes zero, ...
➣ In which of the following types of ...
➣ During chaining along straight line,the leader of ...
➣ For design, that length of transition curve ...
➣ What is the off-tracking of a vehicle ...
➣ In survey works declinations varies from time ...
➣ Length of summit curve for a stopping ...
➣ Permissible limits of error in chaining of ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Building Material
➤ Irrigation
➤ Steel Structure
➤ Solid Waste and Waste Water Treatment
➤ Pollution (Air and Noise)
➤ Soil Mechanics and Foundation
➤ Water Supply