Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Gravity model is used in transportation planning ...
➣ Invar tapes are made of an alloy ...
➣ The optical square is based on the ...
➣ Quadrantal system confines the user to measure ...
➣ In whole circle system, the bearing are ...
➣ True meridians : ...
➣ Shift of the transition curve of radius ...
➣ Normal tension is that pull which : ...
➣ If free mean speed on a roadway ...
➣ Permissible limits of error in chaining of ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Building Material
➤ Solid Waste and Waste Water Treatment
➤ Transportation Engineering
➤ Concrete Structure
➤ Steel Structure
➤ Hydrology
➤ Miscellaneous