♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In desire line diagram : ...
➣ Length of a vehicle affects : ...
➣ The best binder material to be used ...
➣ The chain length which is not the ...
➣ If in a Dorry abrasion test the ...
➣ Chainage is the distance measured : ...
➣ The base line is measured with : ...
➣ When speed of traffic flow becomes zero, ...
➣ 30th highest hour volumes is : ...
➣ Prismatic compass and surveyor's compass respectively given ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Concrete Technology
➤ Building Material
➤ Concrete Structure
➤ Strength of Material
➤ Miscellaneous
➤ Steel Structure
➤ Surveying