Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If free mean speed on a roadway ...
➣ On a right angle road inter-section with ...
➣ Negative errors are caused in chain, when ...
➣ For design, that length of transition curve ...
➣ The base line is measured with : ...
➣ In a closed traverse : ...
➣ The main difference between optical square and ...
➣ Obstacle to ranging but not chaining is ...
➣ Important points selected at the ends of ...
➣ The effect of grade on safe overtaking ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Irrigation
➤ Strength of Material
➤ Hydrology
➤ Miscellaneous
➤ Transportation Engineering
➤ Concrete Structure