Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A negative declination shows the magnetic meridian ...
➣ Open cross staff is used for setting ...
➣ In soil stabilisation : ...
➣ A 30m chain was found to be ...
➣ On the right angled road inter-section with ...
➣ Which of the following statements is/are correct ...
➣ An offset more than 15 m length ...
➣ What is the off-tracking of a vehicle ...
➣ For design, that length of transition curve ...
➣ Negative errors are caused in chain, when ...
❖ Take a qick MCQ Test on
➤ Water Supply
➤ Soil Mechanics and Foundation
➤ Building Material
➤ Concrete Technology
➤ Hydrology
➤ Miscellaneous
➤ Concrete Structure
➤ Surveying