♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In which of the following traffic signal ...
➣ In compass surtveying : ...
➣ On a right angled road inter-section with ...
➣ A vehicle moving at 40 kmph speed ...
➣ Positive error is caused if : ...
➣ Maximum allowable limit upto that a measurement ...
➣ In which of the following traffic signal ...
➣ A river is an obstacle to : ...
➣ If in a Dorry abrasion test the ...
➣ Chain surveying is used for : ...
❖ Take a qick MCQ Test on
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment
➤ Surveying
➤ Irrigation
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Hydrology
➤ Strength of Material