Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For detecting whether a bitumen is cracked ...
➣ Permissible limits of error in chaining of ...
➣ A 30m chain was found to be ...
➣ With regards to traversing : ...
➣ Length of a vehicle affects : ...
➣ If free mean speed on a roadway ...
➣ Chain surveying is used for : ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ The closing error in a traverse is ...
➣ The position of point can be fixed ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Concrete Technology
➤ Hydrology
➤ Pollution (Air and Noise)
➤ Irrigation
➤ Concrete Structure
➤ Steel Structure
➤ Transportation Engineering