♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Chainage is the distance measured : ...
➣ For design, that length of transition curve ...
➣ Shift of the transition curve of radius ...
➣ The closing error in a traverse is ...
➣ Which of the following statements is/are correct ...
➣ Negative errors are caused in chain, when ...
➣ What is the off-tracking of a vehicle ...
➣ Obstacle to ranging but not chaining is ...
➣ In compass surtveying : ...
➣ If a vehicle travelling at 40 kmph ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Concrete Technology
➤ Irrigation
➤ Concrete Structure
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Water Supply
➤ Steel Structure