Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A vehicle moving at 40 kmph speed ...
➣ Which of the following statements is/are correct ...
➣ Drive ways aire : ...
➣ A rotary will be more suitable than ...
➣ A field is measured with a 1.0 ...
➣ Quadrantal system confines the user to measure ...
➣ The closing error in a traverse is ...
➣ The base line is measured with : ...
➣ Compensating errors in chaining are : ...
➣ During chaining along straight line,the leader of ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Concrete Structure
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Soil Mechanics and Foundation
➤ Surveying
➤ Miscellaneous
➤ Steel Structure