♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With referance to the Marshall mix design ...
➣ Chain surveying is used for : ...
➣ The position of point can be fixed ...
➣ The effect of grade on safe overtaking ...
➣ If in a Dorry abrasion test the ...
➣ Secular variation is important is important factor ...
➣ What is the off-tracking of a vehicle ...
➣ Method of offset laying involving minimum measurement ...
➣ The closing error in a traverse is ...
➣ Length of transition curve for design speed ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Hydrology
➤ Building Material
➤ Water Supply
➤ Concrete Technology
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Strength of Material