♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For detecting whether a bitumen is cracked ...
➣ Clearance distance or set back distance required ...
➣ Drive ways aire : ...
➣ The effect of grade on safe overtaking ...
➣ Secular variation is important is important factor ...
➣ Metallic tapes are made of : ...
➣ Limiting length of offset depends upon : ...
➣ Important points selected at the ends of ...
➣ A 30m chain was found to be ...
➣ The base line is measured with : ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Concrete Structure
➤ Water Supply
➤ Pollution (Air and Noise)
➤ Transportation Engineering
➤ Steel Structure
➤ Fluid Mechanics and Hydraulics
➤ Miscellaneous