Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The sag correction is always : ...
➣ Maximum allowable limit upto that a measurement ...
➣ In a prismatic compass : ...
➣ Chain surveying is used for : ...
➣ The tie line is run throught the ...
➣ On a right angle road inter-section with ...
➣ Positive error is caused if : ...
➣ An offset more than 15 m length ...
➣ Metallic tapes are made of : ...
➣ The base line is measured with : ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Concrete Structure
➤ Pollution (Air and Noise)
➤ Surveying
➤ Building Material
➤ Water Supply
➤ Hydrology
➤ Concrete Technology