♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Limiting length of offset depends upon : ...
➣ The closing error in a traverse is ...
➣ With increase in speed of the traffic ...
➣ The tie line is run throught the ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ Open cross staff is used for setting ...
➣ Chain surveying is used for : ...
➣ On a right angle road inter-section with ...
➣ A rotary will be more suitable than ...
➣ In desire line diagram : ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Pollution (Air and Noise)
➤ Building Material
➤ Concrete Technology
➤ Concrete Structure
➤ Surveying
➤ Soil Mechanics and Foundation
➤ Water Supply