Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Negative errors are caused in chain, when ...
➣ The base line is measured with : ...
➣ In a prismatic compass : ...
➣ The tie line is run throught the ...
➣ If in a Dorry abrasion test the ...
➣ In desire line diagram : ...
➣ Secular variation is important is important factor ...
➣ A negative declination shows the magnetic meridian ...
➣ For a constant value of co-efficient of ...
➣ A field is measured with a 1.0 ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Transportation Engineering
➤ Water Supply
➤ Strength of Material
➤ Soil Mechanics and Foundation
➤ Concrete Technology
➤ Steel Structure
➤ Building Material