♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Length of summit curve for a stopping ...
➣ Metallic tapes are made of : ...
➣ In a prismatic compass : ...
➣ Clearance distance or set back distance required ...
➣ For accurate work,in comparison to chain, the ...
➣ The closing error in a traverse is ...
➣ If ruling gradients is 1 in 20 ...
➣ A river is an obstacle to : ...
➣ Maximum allowable limit upto that a measurement ...
➣ In whole circle system, the bearing are ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Water Supply
➤ Miscellaneous
➤ Transportation Engineering
➤ Soil Mechanics and Foundation
➤ Steel Structure
➤ Pollution (Air and Noise)
➤ Building Material