♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.4K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ During chaining along straight line,the leader of ...
➣ For detecting whether a bitumen is cracked ...
➣ The effect of grade on safe overtaking ...
➣ What is the mechanical widening required for ...
➣ For design, that length of transition curve ...
➣ On the right angled road inter-section with ...
➣ Obstacle to ranging but not chaining is ...
➣ Important points selected at the ends of ...
➣ Length of transition curve for design speed ...
➣ Errors which remain after mistakes and systematic ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Hydrology
➤ Concrete Structure
➤ Transportation Engineering
➤ Surveying
➤ Soil Mechanics and Foundation
➤ Solid Waste and Waste Water Treatment
➤ Building Material