♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With regards to traversing : ...
➣ If a vehicle travelling at 40 kmph ...
➣ Which of the following statements is/are correct ...
➣ Metallic tapes are made of : ...
➣ Most probable value of an observed quantity ...
➣ Quadrantal system confines the user to measure ...
➣ Shift of the transition curve of radius ...
➣ In compass surtveying : ...
➣ The optical square is based on the ...
➣ Limiting length of offset depends upon : ...
❖ Take a qick MCQ Test on
➤ Water Supply
➤ Concrete Structure
➤ Miscellaneous
➤ Strength of Material
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Pollution (Air and Noise)
➤ Steel Structure