Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A 30m chain was found to be ...
➣ Inclination of the needle to the horizontal ...
➣ Quadrantal system confines the user to measure ...
➣ Gravity model is used in transportation planning ...
➣ Chain surveying is used for : ...
➣ Permissible limits of error in chaining of ...
➣ If in a Dorry abrasion test the ...
➣ What is the psychological widening of pavement ...
➣ Obstacle to ranging but not chaining is ...
➣ In which of the following traffic signal ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Steel Structure
➤ Transportation Engineering
➤ Soil Mechanics and Foundation
➤ Pollution (Air and Noise)
➤ Building Material
➤ Miscellaneous
➤ Concrete Structure