Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ 30th highest hour volumes is : ...
➣ The tie line is run throught the ...
➣ During chaining along straight line,the leader of ...
➣ Length of transition curve for design speed ...
➣ Positive error is caused if : ...
➣ In whole circle system, the bearing are ...
➣ Compensating errors in chaining are : ...
➣ With referance to the Marshall mix design ...
➣ For design, that length of transition curve ...
➣ In a closed traverse : ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Irrigation
➤ Hydrology
➤ Transportation Engineering
➤ Surveying
➤ Pollution (Air and Noise)
➤ Concrete Structure
➤ Fluid Mechanics and Hydraulics