Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.4K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If average centre to centre spacing of ...
➣ The base line is measured with : ...
➣ On a right angled road inter-section with ...
➣ On the right angled road inter-section with ...
➣ A 30m chain was found to be ...
➣ On a right angle road inter-section with ...
➣ Length of summit curve for a stopping ...
➣ Chain surveying is used for : ...
➣ Maximum allowable limit upto that a measurement ...
➣ The best binder material to be used ...
❖ Take a qick MCQ Test on
➤ Building Material
➤ Hydrology
➤ Soil Mechanics and Foundation
➤ Concrete Technology
➤ Miscellaneous
➤ Transportation Engineering
➤ Concrete Structure
➤ Surveying