Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In which of the following traffic signal ...
➣ With referance to the Marshall mix design ...
➣ Method of offset laying involving minimum measurement ...
➣ A vehicle moving at 40 kmph speed ...
➣ Positive error is caused if : ...
➣ Metallic tapes are made of : ...
➣ An offset more than 15 m length ...
➣ A building is an obstacles to : ...
➣ A negative declination shows the magnetic meridian ...
➣ For detecting whether a bitumen is cracked ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Concrete Technology
➤ Steel Structure
➤ Solid Waste and Waste Water Treatment
➤ Hydrology
➤ Miscellaneous
➤ Transportation Engineering
➤ Strength of Material